Meyer Werft GmbH & Co.KG | 2023
• Shipwide glass balustrade and glass door installations
• Door and window installations
• Mirror and decorative glass installations
• Shower door coating installation in cabins
• Total 2900 sqm
• Atrium, 6-8 decks (D. 8, 940 sqm)
• Atrium Promenade
• Jewellery
• Gallery pixels
• Office and electrical room
• Beach club interior outfitting (1200 sqm)
• Kids & teens interior outfitting (300 sqm)
• Atrium floor tiling works deck 8 (960 sqm)
• Bolidt installations on decks 14-16 (6000 sqm)